This makes me feel Connected Delighted Empowered Enlightened Inspired at an Individual but Shared scale
Floating Piers
Temporary goldenrod fabric bridge system
A site specific work in 2016 on Lake Iseo near Brasica, Italy. Floating Piers consisted of 70,000 square meters of yellow fabric, on a floating dock system of 226,000 high-density polyethylene cubes. The system created a walkable surface that undulated in the water on Lake Iseo connecting Sulzano, Monte Isola and the island of San Paolo. The floating system was anchored to the lakebed by divers, using about 220 six-ton anchors. The project lasted 16 days and attracted over 1.2 million visitors and was estimated to have cost $17 million.